Data-center registry · Franklin County, Missouri

Data centers in Franklin County

1 facility: 1 planned. Each dot is a public record; its color is what that record says about the facility’s status.

Geolocity data-center registry · snapshot September 18, 2026

Facilities

1

Operational

0

Planned

1

Franklin County in context

Natural-hazard risk

Relatively Moderate

Risk index score 83.5 of 100 · expected annual loss $59,519,336

Social vulnerability relatively low · community resilience relatively high

FEMA National Risk Index · December 2025

Grid carbon intensity

1,240 lb CO₂ per MWh

Renewables 15.2% of generation (wind 12.5%, solar 1.6%)

eGRID subregion SRMW (SERC Midwest)

EPA eGRID 2023 · eGRID2023 rev2 (June 12, 2025)

Industrial electricity rate

7.61¢ per kWh

Sales-weighted across 3 bundled utilities serving the county, 4,123,936 MWh of industrial sales

Union Electric Co - (MO); Three Rivers Electric Coop; Crawford Electric Coop, Inc

EIA-861 2024 · 2024 final

County-level figures from federal datasets, stored as published. They describe the county, not any one parcel.

Loading map…
  • Operational · 0A mapped building in OpenStreetMap, a Texas Comptroller program registration, or news reporting the site as running.
  • Under construction · 0News reporting construction underway at the site.
  • Planned · 1A TCEQ air permit on file with no mapped building yet, or a project announced in the news. Permits come before buildings, so this is the early-warning state.
  • Paused · 0News reporting the project on hold.
  • Inactive · 0News reporting the facility closed or the project cancelled.
  • Registered, status unknown · 0In a state registry under a program that says nothing about construction (no air permit, no mapped building). Unknown is the answer, not a guess.

Every facility in Franklin County

FacilityStatusSourcesRecord

Gateway Digital Campus

Location approximate

PlannedNewsSource

In the news in Franklin County

  1. September 15, 2026FacilityPlanned

    Franklin County, Missouri approves data center rezoning and rewrites its setback rule

    The county approved rezoning for the Gateway Digital Campus near Villa Ridge and changed setbacks from 1,000 feet from property lines to 1,000 feet from inhabited homes.

    First Alert 4

How this registry is counted

One row is one campus. OpenStreetMap maps individual buildings, so buildings within 400 meters of each other fold into a single facility; a facility found by two sources within 400 meters of each other is one row that lists both. Coordinates are never altered — a merged row keeps the mapped building’s position.

Status is inferred from what each source states and nothing more: a mapped building or a Texas Comptroller registration means the facility exists; a TCEQ air permit with no building yet means it is permitted, not built; a registry entry under a non-air program says nothing about construction, and the row says so. No source here confirms anything on site.

State and county come from the U.S. Census TIGER/Line county boundaries the facility point falls inside. Every count on this page is computed from the same registry file — nothing is typed in by hand.

Questions

How many data centers are in Franklin County, Missouri?

As of the September 18, 2026 registry snapshot, Franklin County has 1 facility: 1 planned. Named facilities include Gateway Digital Campus. Only facilities recorded by a public source Geolocity mirrors are counted.

Where do these rows come from?

Buildings tagged as data centers in OpenStreetMap, the Texas Comptroller's data-center program registry, and facilities registered as data centers in TCEQ's Central Registry. Each row links the record it came from. County placement uses U.S. Census TIGER/Line boundaries.

What does a data center near a parcel mean for the land?

Two things a landowner cannot see from the surface: demand for nearby land and competition for local water and power. The Geolocity parcel report shows every facility within 25 miles of a specific address alongside the aquifer beneath it and the county's industrial water use. This page is the public record; it is information, not advice.

Sources and licenses

  • OpenStreetMap © OpenStreetMap contributors. ODbL 1.0 (Open Database License).
  • Texas Comptroller data-center program Texas Comptroller of Public Accounts, Data Center Program. Public record (Texas Comptroller of Public Accounts).
  • TCEQ Central Registry Texas Commission on Environmental Quality, Central Registry. Public record (Texas Commission on Environmental Quality, via the Texas Open Data Portal).
  • U.S. Census TIGER/Line counties U.S. Census Bureau, TIGER/Line Shapefiles. Public domain (US federal work, 17 U.S.C. § 105).

© OpenStreetMap contributors (ODbL); Texas Comptroller of Public Accounts data-center program registry; Texas Commission on Environmental Quality Central Registry; U.S. Census Bureau TIGER/Line county boundaries. Registry snapshot September 18, 2026.

Information and research only. Facility rows come from public sources Geolocity mirrors (OpenStreetMap, the Texas Comptroller's data-center program registry, TCEQ's Central Registry) and can lag, double-count a campus, or miss a facility; lifecycle is inferred from what each source states, never confirmed on site. Not legal, real-estate, tax, or investment advice.